PofoliaPofolia ile paylaşıldı

Results in Engineering· 2026Q1

Şebeke Kullanılamaması ve Geri Beslemenin Şebekeye Bağlı Çatı Tipi Güneş PV Sisteminin Ekonomik Uygulanabilirliğine Etkisi

Investigation of electric grid unavailability and back-feeding on the economic viability of a grid-connected rooftop solar photovoltaic system integrated with battery energy storage

Masoyi Garba Sanda, Mustapha Abdullahi, Bappah Adamu Umar, Titus John Maibugu ve diğerleri

Kısa özet

Batarya enerji depolamalı, şebekeye bağlı bir çatı tipi güneş PV sistemi, şebeke kullanılabilirliğinin düşük (%0,8) ve enerji geri beslemesine izin verildiği durumlarda en ekonomik olarak uygulanabilir olup, 5,5 yıllık geri ödeme süresi ve 0,118 $/kWh LCOE elde etmektedir.

Yapay zekâ ile başlık ve abstract'tan üretildi; tam metin okunmaz.

Ana noktalar

  • Şebeke kullanılabilirliğinin düşük olması, güneş PV sistemlerinin ekonomik performansını önemli ölçüde etkiler.
  • Şebeke kullanılabilirliğinin %0,8 olduğu ve geri beslemeye izin verilen sistemler en iyi ekonomik sonuçları elde etmiştir.
  • Optimal sistem performansı, 143.129 MWh ömür boyu enerji üretimi ve 0,773 performans oranını içermiştir.
  • En iyi senaryo, 5,5 yıllık bir geri ödeme süresi ve 0,118 $/kWh LCOE ile sonuçlanmıştır.
  • 25 yıllık proje ömrü boyunca toplam 46.155 ton CO2 emisyonu tasarrufu sağlanmıştır.

Yapay zekâ ile başlık ve abstract'tan üretildi; tam metin okunmaz.

Özet (abstract)

ABSTRACT The generation of energy with renewable energy resources is necessary to achieve the sustainable development goal of clean and affordable energy. This study investigates the effect of an unreliable electric grid on solar photovoltaic energy integration. Also, it assesses the effect of back-feeding energy to the electric grid on the economic viability of the system. The case study location is Eagle Square in the Federal Capital Territory Abuja of Nigeria. A detailed analysis of technical, economic and environmental aspects of the solar photovoltaic system is discussed. The study considered electric grid islanding of the mini grid system due to power outage on the main electric grid with unavailability ranging from 0.8% to 67% annually. PVSyst was used to integrate the building 3D model with solar photovoltaic panels and run the energy simulation. The best performing system had the ability to back-feed energy to the grid with a 0.8% grid unavailability, the lifetime energy generation was 143,129 MWh at a performance ratio of 0.773. The project had a payback period of 5.5 years with an LCOE of 0.118 $/kWh, it had a total carbon dioxide emission saving of 46,155 tons for the 25 years project lifetime.

Yazarların özeti; kaynağından alınmıştır. Results in Engineering, 2026 · DOI ↗

ÇıkarımlarPremium
Makaleye SorÜcretsiz hesapla

Ücretsiz hesapla devam et

Makaleye Sor ile bu makaleye günde 3 soru ücretsiz; makaleyi kaydet, kaynakçasını al, ilgi alanına göre her gün yeni özetler. Çıkarımlar Premium.

Web'de ücretsiz devam et

Google ya da Apple hesabınla giriş; kart istemez. Bu makaleye geri dönersin.

Telefonda:

Alan: Elektrik ve Elektronik Mühendisliği

Electrical and Electronic EngineeringEngineering