A BIM-Based Framework for Managing Variation Claims in Tunnel Projects
- 0citations
- Q1SCImago
- 2026year
Short summary
A novel BIM-based framework integrates contractual and construction data to estimate potential outcomes of variation claims in tunnel projects, facilitating intermediate settlements.
AI-generated from the title and abstract; the full text is not read.
Key points
- Proposes a BIM-based framework for managing variation claims in tunnel projects.
- Integrates contractual and construction data with BIM 3D/4D visualization.
- Estimates potential outcomes of variation claims, including cost adjustments and time extensions.
- Validated via two case studies, showing capability for intermediate settlements.
AI-generated from the title and abstract; the full text is not read.
Abstract
Abstract Tunnel construction projects are highly prone to variations (change orders) and claims due to inherent geotechnical uncertainties that often result in cost overruns and delays. Traditional project management skills relying on fragmented documentation are inadequate for managing the complex and prolonged variation claims. To fill this gap, this study proposes a building information modeling (BIM)-based framework that uses both contractual and construction data to estimate project data–based potential outcomes of variation claims. It integrates BIM three-dimensional (3D) modeling and four-dimensional (4D) visualization to analyze data, identify accurate scope, calculate changed quantities for cost adjustment, and estimate potential time extension under variations. The framework is validated through two case studies, demonstrating its capability to provide intermediate settlements that can facilitate human negotiators to decide the claims. The findings highlight the framework’s potential to enhance transparency, efficiency, and fairness in the dispute resolution process, extending BIM’s application beyond design coordination toward digitally supported claim management and settlement.
The authors' abstract, as published at the source. Journal of Construction Engineering and Management, 2026 · DOI ↗
Continue with a free account
Ask the paper: 3 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.
Continue free on the webSign in with Google or Apple; no card needed. You come back to this paper.
On your phone:
Field: Building and Construction
Building and ConstructionEngineering