Spatial patterns of hybrid PV–CSP–TES configurations for green hydrogen production across Algeria

Mawloud Guermoui, Abdelfetah Belaid, Farid Melgani

Short summary

Optimal configurations for green hydrogen production using hybrid PV-CSP-TES systems vary significantly across Algeria, with optimal PV capacity ranging from 70.03 to 168.86 MW and CSP power-block capacity from 50.00 to 92.98 MW, depending on local meteorological conditions.

AI-generated from the title and abstract; the full text is not read.

Key points

  • Optimal hybrid PV-CSP-TES system designs for green hydrogen production differ across Algeria due to varying meteorological conditions.
  • PV capacity ranged from 70.03 to 168.86 MW, CSP power-block capacity from 50.00 to 92.98 MW, and solar multiple from 2.35 to 3.40 in optimal configurations.
  • The levelized cost of hydrogen (LCOH) varied from €6.00 to €10.78 kg−1 H2 before site-specific constraints were applied.
  • Hybrid PV-CSP-TES systems enhance electrolyzer utilization and production continuity compared to PV-only systems when intermittency is a concern.

AI-generated from the title and abstract; the full text is not read.

Abstract

Existing studies have optimized hybrid PV–CSP plants or mapped suitable locations for solar hydrogen production, but the spatial dependence of the optimal hybrid architecture remains insufficiently resolved. This study develops a national-scale framework that couples GIS–FAHP screening with hourly PV–CSP–TES–electrolyzer simulation and site-specific NSGA-II optimization to determine how the cost-optimal system design changes across Algeria. At each meteorological location, PV capacity, CSP power-block capacity, TES duration, and solar multiple are jointly optimized for a fixed 50 MW electrolyzer, with the final configuration selected as the lowest levelized cost of hydrogen (LCOH) solution satisfying annual demand satisfaction (ADS) ≥ 90%. The resulting architecture varies substantially across the country: optimal PV capacity ranges from 70.03 to 168.86 MW, CSP power-block capacity from 50.00 to 92.98 MW, and solar multiple from 2.35 to 3.40, while annual hydrogen production remains comparatively stable at 7.58–7.65 kt H₂ yr −1 . Unconstrained LCOH ranges from 6.00 to 10.78 € kg −1 H₂ and narrows considerably after GIS-based deployment constraints are imposed. At Hassi R'Mel, the selected architecture combines approximately 100 MW PV, 50 MW CSP, SM = 2.80, and 16 h TES, achieving an LCOH of 6.53 € kg −1 H₂, 90.3% ADS and approximately 7.6 kt H₂ yr −1 . Sensitivity analysis identifies the discount rate and CSP capital cost as the strongest economic influences within the examined parameter ranges. A matched-output comparison shows that PV-only production can achieve lower LCOH when intermittency is acceptable, whereas PV–CSP–TES substantially increases electrolyzer utilization and production continuity. The results demonstrate that site-specific optimization is necessary to capture how economically preferred generation capacities and solar-field sizing adapt to local solar-resource conditions.

The authors' abstract, as published at the source. Applied Energy, 2026 · DOI ↗

TakeawaysPremium Ask the paperFree account

Continue with a free account

Ask the paper: 5 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.

Continue free on the web

Sign in with Google or Apple; no card needed. You come back to this paper.

On your phone:

Field: Energy Engineering and Power Technology

Energy Engineering and Power TechnologyEnergy