Journal of Performance of Constructed Facilities· 2019Q2
Forensic Investigation of a Water Inrush Accident during Ground Freezing Recovery Work
- 16citations
- Q2SCImago
- 2019year
Short summary
A forensic investigation identified flawed freezing pipe layout, bulkhead issues, premature frozen soil removal, and lack of insulation as causes of a water inrush accident during Nanjing metro tunnel recovery, leading to a 15x20m sinkhole.
AI-generated from the title and abstract; the full text is not read.
TakeawaysIn the app
Key pointsIn the app
Ask the paperIn the app
The rest is in the Pofolia app
Takeaways, key points and questions to the paper; new summaries every day for your field. Free.
Sign in on the web to openField: General Engineering
General EngineeringEngineering