A multi-stage methodology for wind park inter-array cabling: graph preparation, routing, and sizing
- 0citations
- Q1SCImago
- 2026year
Short summary
A new three-stage methodology optimizes wind park inter-array cabling by first preparing a graph considering terrain and exclusion zones, then using a mixed-integer linear formulation for pathfinding with string constraints, and finally sizing conductors via linear power flow approximation, limiting types used.
AI-generated from the title and abstract; the full text is not read.
Key points
- Introduces a three-stage methodology for wind park inter-array cabling: graph preparation, pathfinding, and conductor sizing.
- Graph preparation accounts for terrain, exclusion zones, and export cables.
- Pathfinding uses a mixed-integer linear formulation for radial arrays with crossing and string constraints.
- Conductor sizing employs a linear power flow approximation to limit conductor types.
- Methodology evaluated on existing onshore and offshore project layouts with current turbine ratings.
AI-generated from the title and abstract; the full text is not read.
Abstract
Abstract. Inter-array grid optimisation plays a critical role in the technical and economic performance of wind parks and is typically divided into two primary tasks: layout length minimisation and conductor size selection. This work proposes the consideration of three primary tasks, beginning with graph preparation to account for terrain profiles, soft and hard exclusion zones, and export cables. Once a graph with viable connection pathways is established, a pathfinding mixed-integer linear formulation for radial arrays, subject to crossing constraints and a maximum number of turbines per string, is presented. This formulation can be adapted to user requirements to include a minimum number of turbines per string, as well as a methodology to determine the minimum number of substation connections required under irregular turbine distributions arising from terrain constraints. Conductor size selection is addressed through a linear approximation of the power flow, enabling the limitation of the number of conductor types used within the system. Pathfinding and conductor size selection may be combined within an integrated approach or implemented as a sequential algorithm to explore trade-offs between trenching and cabling costs. The proposed approaches are evaluated using current turbine ratings and the layouts of both onshore and offshore existing projects.
The authors' abstract, as published at the source. Wind energy science, 2026 · DOI ↗
Continue with a free account
Ask the paper: 3 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.
Continue free on the webSign in with Google or Apple; no card needed. You come back to this paper.
On your phone:
Field: Aerospace Engineering
Aerospace EngineeringEngineering