PofoliaDaily literature tracker

Operations Research· 2026Q1

Alternating Methods for Large-Scale AC Optimal Power Flow with Unit Commitment

Matthew Brun, Thomas Lee, Dirk Lauinger, Xin Chen et al.

Short summary

A new decomposition scheme and penalty alternating direction method solve large-scale security-constrained unit commitment with AC optimal power flow (SCUC-ACOPF) problems, achieving near-optimal solutions with an average optimality gap of 1.33% within strict time limits.

AI-generated from the title and abstract; the full text is not read.

Key points

  • Proposes a decomposition scheme and penalty alternating direction method for SCUC-ACOPF.
  • Leverages spatial and temporal decomposition, separating bus and time period subproblems.
  • Incorporates heuristics such as temporal linking constraint restrictions and second-order cone relaxation.
  • Achieves an average optimality gap of 1.33% on large-scale test cases from the U.S. Department of Energy's Grid Optimization Competition.
  • Demonstrates the ability to find near-optimal solutions within stringent time limits for power grid operations.

AI-generated from the title and abstract; the full text is not read.

Abstract

Security-constrained unit commitment with alternating current optimal power flow (SCUC-ACOPF) is a central problem in power grid operations that optimizes commitment and dispatch of generators under a physically accurate power transmission model while encouraging robustness against component failures. SCUC-ACOPF requires solving large-scale problems that involve multiple time periods and networks with thousands of buses within strict time limits. In this work, we study a detailed SCUC-ACOPF model with a rich set of features of modern power grids, including price-sensitive load, reserve products, transformer controls, and energy-limited devices. We propose a decomposition scheme and a penalty alternating direction method to find high-quality solutions to this model. Our methodology leverages spatial and temporal decomposition, separating the problem into a set of mixed-integer linear programs for each bus and a set of continuous nonlinear programs for each time period. To improve the performance of the algorithm, we introduce a variety of heuristics, including restrictions of temporal linking constraints, a second-order cone relaxation, and a contingency screening algorithm. We quantify the quality of feasible solutions through a dual bound from a second-order cone program. To evaluate our algorithm, we use large-scale test cases from Challenge 3 of the U.S. Department of Energy s Grid Optimization Competition that resemble real power grid data under a variety of operating conditions and decision horizons. The experiments yield feasible solutions with an average optimality gap of 1.33%, demonstrating that this approach generates near-optimal solutions within stringent time limits.

The authors' abstract, as published at the source. Operations Research, 2026 · DOI ↗

TakeawaysPremium Ask the paperFree account

Continue with a free account

Ask the paper: 5 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.

Continue free on the web

Sign in with Google or Apple; no card needed. You come back to this paper.

On your phone:

Field: Electrical and Electronic Engineering

Electrical and Electronic EngineeringEngineering