Journal of Transportation Engineering Part A Systems· 2019Q2
Deterioration Prediction of Track Geometry Using Periodic Measurement Data and Incremental Support Vector Regression Model
- 29citations
- Q2SCImago
- 2019year
Short summary
An incremental support vector regression (ISVR) model, enhanced with Bayesian optimization, predicts track geometry deterioration with ~20% greater accuracy than conventional models.
AI-generated from the title and abstract; the full text is not read.
Key points
- Introduced an incremental support vector regression (ISVR) model with Bayesian optimization for track geometry deterioration prediction.
- The ISVR model leverages periodic track measurement data.
- Achieved approximately 20% higher prediction accuracy compared to conventional models.
- The findings support optimal scheduling of track maintenance.
AI-generated from the title and abstract; the full text is not read.
Abstract
Information on the quality of ballasted track is normally collected from a track measurement vehicle operating on a monthly basis or otherwise periodically. Track deterioration in terms of alignment and vertical levels is normally predicted by time-series data collected up to a certain point, and subsequent maintenance work is undertaken based on the predetermined maintenance level of the track geometry classified according to its importance. In this regard, deterioration of track geometry based on time-series measurement data can be efficiently modeled by an online support vector regression (OSVR) scheme, and detailed investigation has been carried out to improve the previous work on batch-type prediction models of track geometry proposed by the authors. For such purposes, an incremental support vector regression (ISVR) model based on a Bayesian optimization scheme as well as an OSVR model are introduced in this paper, and the prediction results are compared with those obtained by a conventional machine learning model. The results show that the accuracy of the proposed model increases by approximately 20% compared with that of the conventional model, and the outcome can be applied to the optimal scheduling of track maintenance work.
The authors' abstract, as published at the source. Journal of Transportation Engineering Part A Systems, 2019 · DOI ↗
Continue with a free account
Ask the paper: 3 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.
Continue free on the webSign in with Google or Apple; no card needed. You come back to this paper.
On your phone:
Field: General Engineering
General EngineeringEngineering