Scientific Reports· 2026Q1
A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment
- 0citations
- Q1SCImago
- 2026year
Short summary
A new framework shows that space-elevator transshipment for lunar construction is not inherently dominant, with its success depending on capacity, schedule, and reliability, not just its introduction.
AI-generated from the title and abstract; the full text is not read.
Key points
- A reliability-aware framework models lunar construction logistics, comparing direct, space-elevator transshipment, and hybrid transport.
- Direct transport for $10^8$ t takes 8.01 years; space-elevator transshipment takes 235.91 years.
- Analytical capacity bounds and nondimensional coordinates distinguish structural infeasibility from numerical non-acceptance.
- Campaign simulations show a mix of rocket-dominant, mixed, and SE-transshipment-dominant operations are feasible.
- Transshipment dominance is shown to depend on capacity, schedule, and reliability, not solely on the presence of a space elevator.
AI-generated from the title and abstract; the full text is not read.
Abstract
Abstract Large-scale lunar construction requires campaign-level logistics models that distinguish route capacity, reliability, infrastructure commissioning, and transshipment constraints. We develop a reliability-aware three-node Earth–Apex–Moon framework comparing direct Earth–Moon transport, space-elevator (SE) transshipment, and hybrid operation. Analytical capacity bounds and nondimensional coordinates separate structural infeasibility from numerical non-acceptance and characterize architecture-regime transition regions. For a $$10^{8}\,\textrm{t}$$ stress-test target, the reference direct and transshipment-only construction times are $$8.01$$ and $$235.91$$ years, respectively. Of $$294$$ structured cases, $$223$$ are analytically feasible and $$197$$ satisfy the numerical acceptance criteria, yielding an $$88.3\%$$ conditional acceptance rate. All $$48$$ transition cases retain their regime classifications under refined temporal discretization. Among $$500$$ accepted Latin-hypercube campaigns, the conditional design frequencies are $$10.8\%$$ rocket-dominant, $$42.6\%$$ mixed, and $$46.6\%$$ SE-transshipment-dominant; reclassification under alternative thresholds preserves the coexistence of all three regimes. A $$36$$ -case onward-transport analysis further yields approximately $$2.00\times 10^{3}$$ – $$7.79\times 10^{3}$$ scheduled Apex–Moon operation-equivalents per year. These results show that transshipment dominance depends jointly on capacity, schedule, and reliability conditions rather than following intrinsically from the introduction of a space elevator.
The authors' abstract, as published at the source. Scientific Reports, 2026 · DOI ↗
Continue with a free account
Ask the paper: 3 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.
Continue free on the webSign in with Google or Apple; no card needed. You come back to this paper.
On your phone:
Field: Aerospace Engineering
Aerospace EngineeringEngineering