A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment

Qiurui Liu, Jiaqi Huang, Yong Wang

Short summary

A new framework shows that space-elevator transshipment for lunar construction is not inherently dominant, with its success depending on capacity, schedule, and reliability, not just its introduction.

AI-generated from the title and abstract; the full text is not read.

Key points

  • A reliability-aware framework models lunar construction logistics, comparing direct, space-elevator transshipment, and hybrid transport.
  • Direct transport for $10^8$ t takes 8.01 years; space-elevator transshipment takes 235.91 years.
  • Analytical capacity bounds and nondimensional coordinates distinguish structural infeasibility from numerical non-acceptance.
  • Campaign simulations show a mix of rocket-dominant, mixed, and SE-transshipment-dominant operations are feasible.
  • Transshipment dominance is shown to depend on capacity, schedule, and reliability, not solely on the presence of a space elevator.

AI-generated from the title and abstract; the full text is not read.

Abstract

Abstract Large-scale lunar construction requires campaign-level logistics models that distinguish route capacity, reliability, infrastructure commissioning, and transshipment constraints. We develop a reliability-aware three-node Earth–Apex–Moon framework comparing direct Earth–Moon transport, space-elevator (SE) transshipment, and hybrid operation. Analytical capacity bounds and nondimensional coordinates separate structural infeasibility from numerical non-acceptance and characterize architecture-regime transition regions. For a $$10^{8}\,\textrm{t}$$ stress-test target, the reference direct and transshipment-only construction times are $$8.01$$ and $$235.91$$ years, respectively. Of $$294$$ structured cases, $$223$$ are analytically feasible and $$197$$ satisfy the numerical acceptance criteria, yielding an $$88.3\%$$ conditional acceptance rate. All $$48$$ transition cases retain their regime classifications under refined temporal discretization. Among $$500$$ accepted Latin-hypercube campaigns, the conditional design frequencies are $$10.8\%$$ rocket-dominant, $$42.6\%$$ mixed, and $$46.6\%$$ SE-transshipment-dominant; reclassification under alternative thresholds preserves the coexistence of all three regimes. A $$36$$ -case onward-transport analysis further yields approximately $$2.00\times 10^{3}$$ – $$7.79\times 10^{3}$$ scheduled Apex–Moon operation-equivalents per year. These results show that transshipment dominance depends jointly on capacity, schedule, and reliability conditions rather than following intrinsically from the introduction of a space elevator.

The authors' abstract, as published at the source. Scientific Reports, 2026 · DOI ↗

TakeawaysPremium
Ask the paperFree account

Continue with a free account

Ask the paper: 3 free questions a day about this paper; save it, get its citation, new summaries every day for your field. Takeaways are Premium.

Continue free on the web

Sign in with Google or Apple; no card needed. You come back to this paper.

On your phone:

Field: Aerospace Engineering

Aerospace EngineeringEngineering